Summer is on it’s way which means summer vacation and also summer construction. Here are a few places that are heavy hitters and places to avoid if possible. Like always be careful and safe

ONTARIO

ONTARIO HWY 401 POINT LALONDE TO SOUTH LANCASTER

Expect delays up to 10 minutes.
Highway 401 – from 2.5 kilometres west of County Road 2 & 34 (Interchange 814) to the Quebec Border
Highway 401 Eastbound on ramp at 4th Line Road / County Road 23 (Interchange 825) closed until to June 7, 2023

OUTSIDE GLENDALE TO CORNWALL
Highway 401 – from 860 metres west of Moulinette Road (Interchange 778) to 300 metres east of Boundary Road (Interchange 796)
Highway 401 Eastbound on ramps at McConnell Avenue (Interchange 792) will be closed from 6:00 a.m. Monday, June 5 to 3:00 p.m. Friday,

401 – INTERCHANGE 687-705 TO WOODRIDGE
Highway 401 – from 3.1 kilometres west of Highway 2 (Interchange 687) to 2.3 kilometres east of Maitland Road (Interchange 705)
Recurring-Engineering Investigation on HWY 401 Eastbound between SHARPES LN/Kelly Rd, Brockville and MAITLAND RD
Highway 401 – from 2.6 kilometres west of to 2.6 kilometres east of Hallecks Road

401 TO JOHN F SCOTT RD. INTERSECTION TO WESTBROOK RD.
Highway 401 – from 1.4 kilometres east of Westbrook Road to 400 metres east of John F. Scott Road

401 -ONROUTE PORT HOPE TO WHITBY
Recurring-Moving Maintenance Closure on HWY 401 Westbound between BOUNDARY ROAD, Port Hope and HARMONY ROAD, Oshawa. 1 Alternating Lane(s).
Detailed closure information is as follows: SUN: 1st Lane Closed at 22:00, 1st Lane Opened at 05:00; MON: 1st Lane Closed at 19:00, 1st Lane Opened at 05:00; TUE: 1st Lane Closed at 19:00, 1st Lane Opened at 05:00; WED: 1st Lane Closed at 19:00, 1st Lane Opened at 05:00; THU: 1st Lane Closed at 19:00, 1st Lane Opened at 05:00;Recurring-Moving Maintenance Closure on HWY 401 Westbound between BOUNDARY ROAD, Port Hope and HARMONY ROAD, Oshawa. 1 Alternating Lane(s).

401-PICKERING TO SCARBOROUGH INTO TORONTO HEADING TO HORNBY
Construction on HWY 401 Eastbound between BROCK ROAD, Pickering and CHURCH ST, Ajax. 1 Right Lane(s).
Detailed closure information is as follows: ALL DAYS: 1st Lane Closed at 19:00, 1st Lane Opened at 05:00;
Construction on HWY 401 Westbound On-ramp at KENNEDY RD -SCARBOROUGH, Toronto. ALL LANES CLOSED.
Recurring-Construction on HWY 401 Eastbound Collector between BAYVIEW AVE and HWY 404, Toronto. 3 Alternating Lane(s).
Detailed closure information is as follows: THU: 1st Lane Closed at 22:00, 2nd Lane Closed at 22:00, 3rd Lane Closed at 22:30, 3rd Lane Opened at 05:30, 2nd Lane Opened at 06:00, 1st Lane Opened at 06:00; FRI: 1st Lane Closed at 23:00, 2nd Lane Closed at 23:00, 3rd Lane Closed at 23:59, 3rd Lane Opened at 07:00, 2nd Lane Opened at 08:00, 1st Lane Opened at 08:00;
Construction on HWY 407 ETR Eastbound Off-ramp at HWY 401, Halton Hills. ALL LANES CLOSED.

 

NEW BRUNSWICK

Bridge Repair on HWY-2 Westbound near Monseigneur Lang Road-Rte. 2 Overpass (North) M586. Width Restriction: 4.7m Activities: Be prepared to stop, One lane traffic, Reduced speed required.
Anticipated End Time Jul 3 2023, 12:13 PM

Bridge Inspection/Maintenance on HWY-2 Eastbound near Green River. Left Lane Closed. Width Restriction: 5.2m Activities: Be prepared to stop, One lane traffic, Reduced speed required.
Anticipated End Time Jun 20 2023, 7:01 PM

Under Construction on Principale Rue Southbound from Erables Ave to Pins St. Activities: One lane traffic, Reduced speed required, Traffic lights present.
Anticipated End Time Jun 12 2023, 8:00 AM

LEAVE A REPLY

Please enter your comment!
Please enter your name here